Your Facility

Configure your data center parameters to generate a personalized comparison.

10 MW
Typical hyperscale: 20-100 MW
$0.07/kWh
US average: $0.05-$0.12/kWh
$4.00/kgal
US average: $2-$8 per 1,000 gallons

Your Savings with TerraFlux

10 MW Facility
Annual Cost Savings
$0
0% reduction
Water Eliminated
0
gallons per year
Carbon Avoided
0
metric tons CO₂/year

Side-by-Side Comparison

Metric Conventional TerraFlux

10-Year Total Cost of Ownership

Capital expenditure + operational costs over a decade. TerraFlux's higher upfront is offset by elimination of water, lower energy, and zero carbon credits needed.

10-year net savings with TerraFlux $0

Ready to see these numbers in person?

Get a custom engineering assessment for your specific facility. Our team will model TerraFlux for your exact site conditions.